![]() MCH 13
MCH 16
|
![]() MCH 21 MCH 23 |
Compactness, performance, robustness and transportability are the main features of the ERGO TPS breathable air compressors. Equipped with four different pumping units (MCH 13, MCH 16, MCH 21 and MCH 23), all in TPS (Tropical Plus Superdry) version and powered by three-phase electric motors. The compressors have a monitoring system panel including pressure gauges, autostop with adjustable pressure switch, automatic condensate drain and and a phase control for rotation direction. The models of this series have two connections for high pressure hoses (from 232 to 330 bar) and an improved filtering system with two Hyperfilters.
H : 770 mm – W : 1120 mm – D : 630 mm
H : 30.31 in – W : 44.09 in – D : 24.80 in
Coltri breathing air compressor MCH 13 ERGO TPS
Drive: Three-phase Electric Motor
Pumping group capacity: 235 l/m – 14,10 m³/h – 8.30 CFM FAD
Filling time: 8 min. 30 sec. ASCOM
* Cylinder filling time from 10 l-0/200 bar (cylinder filling measurement from 0 to 200 bar ± 5%)
Operating pressure: 232 – 300 – 330 bar or 3365 – 4351 – 4786 PSIG
Net weight: 174 kg – 384 Lbs
Noise level: 80,7 db
Available on request: Electric Single Phase
Coltri breathing air compressor MCH 16 ERGO TPS
Drive: Three-phase Electric Motor
Pumping group capacity: 315 l/m – 18,90 m³/h – 11.12 CFM FAD
Filling time: 6 min. 20 sec. ASCOM
* Cylinder filling time from 10 l-0/200 bar (cylinder filling measurement from 0 to 200 bar ± 5%)
Operating pressure: 232 – 300 – 330 bar or 3365 – 4351 – 4786 PSIG
Net weight: 184 kg – 406 Lbs
Noise level: 82,3 db
Available on request: Electric Single Phase
Coltri breathing air compressor MCH 21 ERGO TPS
Drive: Three-phase Electric Motor
Pumping group capacity: 345 l/m – 20,70 m³/h – 12.18 CFM FAD
Filling time: 5 min. 40 sec.
* Cylinder filling time from 10 l-0/200 bar (cylinder filling measurement from 0 to 200 bar ± 5%)
Operating pressure: 232 – 300 – 330 bar or 3365 – 4351 – 4786 PSIG
Net weight: 184 kg – 406 Lbs ASCOM
Noise level: 83 db
Coltri breathing air compressor MCH 23 ERGO TPS
Drive: Three-phase Electric Motor
Pumping group capacity: 380 l/m – 22,80 m³/h – 13.42 CFM FAD
Filling time: 5 min. 15 sec.
* Cylinder filling time from 10 l-0/200 bar (cylinder filling measurement from 0 to 200 bar ± 5%)
Operating pressure: 232 – 300 – 330 bar or 3365 – 4351 – 4786 PSIG
Net weight: 184 kg – 406 Lbs ASCOM
Noise level: 83 db
![]() ![]() |
![]() Components |
![]() |
Components 1. Aspiration filter 2. Intake valve 1st stage 3. Discharge valve 1st stage 4. Cooling pipe 1st-2nd stage 5. Intake valve 2nd stage 6. Discharge valve 2nd stage 7. Safety valve – 1st stage 8. Pressure gauge 9. Cooling pipe 2nd / condensate separator LP 10. LPcondensate separator 11. Safety valve – 2nd stage 12. Pressure gauge 2nd stage 13. Separator pipe/3rd stage 14. Intake valve 3rd stage 15. Discharge valve 3rd stage 16. Final cooling pipe 17. HP condensate separator 18. Safety valve 19. Pressure gauge 20. Purifier filter 21. Pressure maintaining valve 22. Pressure switch 23. Flex hoses |
STANDARD EQUIPMENT:![]() |
![]() |
OPTIONAL EQUIPMENT:![]() |